9A Injection: November 28 thru December 1, 2017
Processed Gladwin Tensor Strainmeter, eddy current vertical strain and tilt, optical fiber areal strainmeter, and well pressure and injection rate data from the well 9A... -
1A Shut-In: March 31 thru April 7, 2017
Processed Gladwin Tensor Strainmeter data from the well 1A shut-in on March 31 thru April 7, 2017, at the North Avant Field, OK -
9A Injection: June 28 thru July 23, 2018
Processed Gladwin Tensor Strainmeter, eddy current vertical strain and tilt, optical fiber areal strainmeter, and well pressure and injection rate data from the well 9A... -
9A Injection: October 11 thru October 17, 2017
Processed Gladwin Tensor Strainmeter, Eddy current vertical strain and tilt, and well pressure data from the well 9A injection on October 11 thru October 17, 2017, at the North...